• Vetted surfacing contractors
  • Written quote
  • UK-wide

Call: 0333 772 0141

  • 1contact from enquiry to handover
  • Holidayswork planned into school holidays when booked early
  • In writingaccreditations and insurance set out with every quote
  • 15 yrsin the industry
Sam GuestAlex Winser

Sam Guest Compliance and client lead
Alex Winser Delivery and project lead
Read more about Sam and Alex

Last updated October 2026

Across East Sussex, West Sussex and Brighton and Hove, wetpour under play equipment is priced at about £40 to £140 per m2 before VAT, and a small resin bound path in Cuckfield was quoted at about £154 per m2. Before any of that, Sussex has a question most counties do not: whether your site sits inside the South Downs National Park, which changes who decides on fencing and lights. Send photos and the address and Alex Winser arranges the survey.

Who decides planning for a court inside the South Downs?

The South Downs National Park Authority, which has been the planning authority for the park since 1 April 2011. In practice the host district often handles the paperwork: in Chichester district, for example, the council decides most applications on the Authority’s behalf and only the significant ones go to the Authority itself. A school or club near Midhurst, Petworth or the edge of Lewes should check this first, because a floodlit court in a national park is weighed against the protected landscape as well as against neighbours. Our planning guide for courts and pitches covers the general test.

Is there an agreed need for new pitches in Brighton and Hove?

Yes, and it is written down, which helps any bid. The city’s playing pitch strategy for 2025 to 2041 finds a current shortfall of one full-size floodlit 3G pitch, ideally in the east of the city, with pipeline projects at Saltdean United, Toad’s Hole Valley, Moulsecoomb and Cardinal Newman School. For rugby, it plans a small World Rugby compliant 3G pitch at Moulsecoomb and is exploring a full-size one at Longhill Sports Centre, so a club wanting contact rugby on 3G should say so before the carpet is chosen. It rates about 21% of grass pitches as poor, plans three new non-turf cricket pitches at Aldrington, Braypool and East Brighton Park, and says section 106 and CIL money from new housing should fund off-site sports projects. If your club or school is named, the funding conversation starts with the council.

Our 3G pitch is worn. Is resurfacing fundable in Mid Sussex?

It is on the list. The Football Foundation’s Mid Sussex plan, January 2025, names replacement carpets at The Burgess Hill Academy, East Grinstead Sports Club and Warden Park Secondary Academy, alongside two new full-size 3G pitches still to be sited. A school or club with an ageing carpet elsewhere in the district should get the surface and shockpad surveyed now, so a costed quote is ready when a funding window opens. Our artificial pitches page explains carpet replacement.

Sussex job Typical price, ex VAT Source
Wetpour play area about £40 to £140 per m2 Supplier list, 2026
Resin bound footpath, Cuckfield about £154 per m2 Parish council quote, 2021
Set of four new tennis courts £150,000 to £200,000 LTA

Which council handles a site outside the National Park?

Brighton and Hove City Council for the city, as a unitary authority; elsewhere, the district or borough within East or West Sussex. A court in Hove and one in Horsham go to different offices, so send the address with your enquiry.

Sources

When should a seafront or holiday site book?

In the off-season. Holiday parks and seafront play areas are busiest in summer, so the survey plans wetpour, markings or court work for autumn to spring dry spells.

How it works

  1. 01Send a plan and photosThe site, the surface and the date it must reopen.
  2. 02We check the groundLevels and where the water drains.
  3. 03Written quoteBuilt around your reopening date.

Can a club court in the Weald be resurfaced rather than rebuilt?

Often. Where the base is sound, a new porous layer and colour coats cost far less than a rebuild; the survey checks first and the quote prices both. See tennis court construction for full builds. A MUGA can usually share a school’s tarmac yard; our MUGA page sets out sizes and fencing for a court that has to fit around play space.

Who runs a Sussex job?

We arrange a vetted local surfacing contractor to carry out Sussex work, confirm who within 2 working days, or tell you plainly if we can’t. Alex Winser stays your single contact from the first call to handover, and the written quote names who does the work before anything is booked.

Get a quote

Tell us about the job

Send a plan, photos and the date the space must reopen. We reply within one working day, check the ground, then send a written quote.

  • Send a plan and photos. The site, the surface and the date it must reopen.
  • We check the ground. Levels and where the water drains.
  • Written quote. Built around your reopening date.

Sam GuestAlex Winser

Sam and Alex oversee every job: Sam runs operations and compliance, Alex runs the work on the ground. Read more about Sam and Alex

Prefer to talk? 0333 772 0141

WeDo Property Services LtdRegistered in England and Wales, company number 15275329.
Registered office:
15B Battersea Square
London
SW11 3RA

Get your fixed priceTakes about two minutes
1What do you need?

2How soon do you need it?

3Your details

Need anything else? Add it to the same quote (optional)
You will probably also need(tick any that apply)

Need something not listed? Tell us in the box below. Through the businesses we run, we can usually help or point you to the right people.

Add notes, photos or drawings (optional)

Site plan, photos or drawings (optional)

PDF, JPG, PNG, HEIC or DWG, up to 5 MB each, up to 3 files

Not got one? No problem, we can work from photos or a quick visit.

We use your details only to reply to this enquiry. Privacy and cookies